Joinery has an order of operations, and so does this. Each step produces something you keep, whether or not you continue with us.
01
Survey
Two weeks · fixed fee
We read the code, watch a real deploy end to end, and sit in on an incident if one obliges. We interview the people who get paged. You receive a written assessment naming the three things costing you the most, with evidence, not adjectives.
02
Seam map
Included in the survey
We map every handoff: where a system passes work to another system, where a person passes work to a machine, where one team passes work to the next. Outages and wasted hours cluster at these points, and most teams are surprised by at least one of them.
03
Fit the piece
Eight to twelve weeks
We build, embedded with your engineers, in your repositories, reviewed by your team. No parallel track that gets thrown over a wall at the end. Work ships to production continuously throughout. The engagement is not the deliverable, the running system is.
04
Hand over
The last two weeks
Runbooks, architecture decision records, and a working session with the people who now own it. We consider the engagement successful when you stop needing us. Consultancies that engineer their own indispensability are a failure mode, not a business model.